ADR-3384: Renovate updates inside its schedule; pull-request runs supersede

  • Status: Accepted
  • Date: 2026-10-28
  • Deciders: Lusoris
  • Tags: ci, renovate, governance

Context

After the host reboot on 2026-10-28 one master push made Renovate rebase six open dependency pull requests at once. Each head starts about 30 workflows, so the account's queue held 268 queued runs at 18:28, and eleven green feature pull requests waited behind them for hours. renovate.json already limits new pull requests to the Monday schedule, but Renovate's updateNotScheduled defaults to true: existing branches are rebased at any time, outside the schedule. Three pull-request workflows (docs.yml, pr-label-lanes.yml, reuse.yml) also had no workflow-level concurrency group, so an older push's runs kept their runner slots after a newer push to the same pull request.

Decision

renovate.json sets updateNotScheduled: false and lowers prConcurrentLimit to 2 and branchConcurrentLimit to 3, so Renovate rebases its branches only inside its schedule and at most two or three heads run their suite at once. reuse.yml gets the ADR-1673 concurrency block. The concurrency contract test (scripts/ci/tests/test_master_concurrency_contract.py) now also refuses a workflow with a pull-request trigger that has no workflow-level group which a newer push of the same pull request cancels. The two workflows that cannot carry one are listed with a reason: docs.yml keeps per-job groups (ADR-1294, ADR-1297; the Pages deploy must never be cancelled), and pr-label-lanes.yml calls workflows that keep their own groups (one group at both levels would deadlock).

Alternatives considered

Option Pros Cons Why not chosen
Schedule plus updateNotScheduled: false, lower limits (chosen) One setting removes the burst; security updates still come through the vulnerability alerts path A conflicted Renovate branch waits for the next Monday window Fits the existing weekly schedule
Group all Renovate updates into one pull request One head per wave One failing update blocks every other one; the repository's rules want one update per pull request for review Larger blast radius
Path filters so dependency heads skip the heavy suites Fewer runs per head Lock and toolchain bumps are exactly the changes the heavy suites must see Would hide real breakage
Do nothing; let the queue drain No change The next reboot or mass rebase repeats the outage The cost recurs

Consequences

  • Positive: a master push no longer starts a rebase wave of every open Renovate branch; superseded pull-request runs free their runners.
  • Negative: a Renovate branch that conflicts on Tuesday stays conflicted until the next Monday window, unless a maintainer ticks its rebase box on the dependency dashboard (which Renovate honours outside the schedule).
  • Neutral / follow-ups: a new pull-request workflow must carry a superseding group or a listed reason; the contract test says which.

References

  • Controller order vmafx-ci-queue-burst-20261028 (paraphrased): cancel stale runs, audit concurrency and path filters, schedule the Renovate branches so one push wave is not six times thirty workflows.
  • Renovate configuration options, updateNotScheduled.